Planned
shutdowns 2022
Zasobnik

Annual shut-down plan 2022

Paragraph

Planned shutdowns of UNGSF Lab 4 (POZAGAS storage)

The annual plan of estimated storage shutdown for the period between 1.1.2022 and 31.12.2022.

Version 1 (29.11.2021)

Version 2 (22.4.2022)

Version 3 (28.10.2022)

 

Note to the document above:
The data stated in the table above arise from current state of knowledge and in case of necessity, they may be subject of additional updates. Any updates shall be announced in accordance with concluded gas storage contracts and current legislation.

Planned maintenance of WAG/MAB connection point (maintenance notified by Gas Connect Austria GmbH)

The annual plan of estimated maintanance for the period between 1.1.2022 and 31.12.2022.

Version 1 (19.11.2021)